Our Certifications, Product Testing & Engineering Credentials

At Val Technology & Engineering, we believe industrial equipment quality should be supported by proper testing, relevant certifications, technical knowledge and practical project experience.

Since 1995, we have supplied industrial valves, steam equipment, flow control products and engineering solutions from our base in Butterworth, Penang. We focus on meeting applicable product requirements while helping customers select equipment suitable for their industrial applications.

Here, we share the registrations, professional qualifications, product testing practices and project records that support our work.

Third-Party Product Testing, Inspection & Certification

We understand that industrial customers need confidence in the quality and compliance of the equipment they purchase. That is why all products we sell undergo relevant testing, and we do not supply products that have not met their applicable testing and certification requirements.

Our Product Testing Arrangements

Depending on the product and customer project requirements, we arrange:

Third-Party Witnessed FAT

Independent inspection organisations attend and witness Factory Acceptance Testing according to the agreed project requirements.

Independent Laboratory Testing

Products are submitted to external laboratories for relevant testing, performance assessments or certification procedures.

Product Compliance Documentation

Applicable test reports, certificates and supporting records are identified according to the product and its intended application.

Our testing and inspection arrangements may involve organisations such as SGS, Bureau Veritas, TÜV and SIRIM, depending on the required scope. Certain products may also be subject to SPAN-related regulatory requirements or Safety Integrity Level (SIL) assessments where applicable.

How Customers Can Check Product Certifications

Different industrial products have different technical specifications, testing procedures and certification requirements. Not every product requires the same approvals or both laboratory testing and third-party witnessed FAT.

As we supply a wide range of equipment, we recommend that customers enquire about the documentation relevant to their selected products, including:

Product Certifications

Applicable product certifications and approvals

Independent Laboratory Testing

Independent laboratory testing reports

Third-Party Inspection

Third-party inspection or witnessed FAT records

Compliance Documents

Technical specifications and compliance documents

For industrial valve enquiries, explore our Industrial Valve Distributor Malaysia services.

Our Company Registrations

Our company registrations provide customers and procurement teams with supporting information when reviewing our business and contractor credentials.

CIDB G5 Contractor Registration

We hold a G5 contractor registration with the Construction Industry Development Board (CIDB) Malaysia.

Our registered categories and specialisations include:

Building (B)

B04

Civil Engineering (CE)

CE21

Mechanical & Electrical Engineering (ME)

M15

This registration supports customers when reviewing contractor classifications and relevant project eligibility requirements.

Our CIDB G5 Contractor Registration Certificate
Val Technology & Engineering CIDB G5 contractor registration certificate
CIDB G5 Contractor Registration — Val Technology & Engineering

Ministry of Finance (MOF) Supplier Registration

We also hold a Malaysian Ministry of Finance (MOF) supplier registration covering approved supply and service categories.

Our registered business activities include relevant categories such as:

Industrial Equipment

Industrial equipment and machinery

Electrical Equipment

Electrical equipment and components

Measuring Instruments

Measuring instruments

Piping Components

Piping components

Other Approved Categories

Other approved procurement categories listed in our registration

These documents help customers identify our registered procurement categories when assessing supplier requirements.

Our MOF Supplier Registration Certificates

Our Engineering Leadership & Professional Qualifications

Our engineering business is supported by a combination of operational management, technical education and professional development.

William Kang — Second-Generation Leadership

Kang Wi Liam, also known as William Kang, is part of our second-generation leadership. He plays an active role in our daily operations, business management and brand development.

His engineering background and professional development activities complement his operational responsibilities and contribute to the continued development of our business.

Board of Engineers Malaysia — Graduate Engineer Registration

William Kang holds a Graduate Engineer registration in Chemical Engineering with the Board of Engineers Malaysia (BEM), approved on 18 September 2025.

His registration provides evidence of his individual engineering qualification. It is a Graduate Engineer registration, not a Professional Engineer qualification.

William Kang's BEM Graduate Engineer Certificate
William Kang Board of Engineers Malaysia Graduate Engineer registration certificate in Chemical Engineering
BEM Graduate Engineer Registration — Chemical Engineering

SIRIM Academy — Measurement & Calibration System Training

William Kang attended the Measurement & Calibration System training programme conducted by SIRIM Academy on 3–4 June 2026.

The training covers an area relevant to industrial engineering applications, particularly:

Measurement Practices

Measurement practices and system understanding

Calibration Knowledge

Calibration-related technical knowledge

Measurement Reliability

Awareness of measurement reliability in equipment applications

This certificate documents his training attendance rather than company-wide SIRIM certification.

SIRIM Academy Training Certificate
William Kang SIRIM Academy Measurement and Calibration System training certificate
SIRIM Academy — Measurement & Calibration System Training

National Engineering Convention 2026

William Kang participated in the National Engineering Convention 2026, organised by the Board of Engineers Malaysia, from 17–20 August 2026.

His participation reflects our engagement with professional engineering activities and continued exposure to developments within the engineering field.

National Engineering Convention Participation Certificate
William Kang National Engineering Convention 2026 participation certificate
National Engineering Convention 2026 Participation

Our Customer Project Completion & Recognition

We believe completed projects and customer acknowledgements provide meaningful evidence of our practical engineering involvement.

The following letters document customer acceptance of two industrial steam system projects, including testing and handover.

Condensate Recovery System — Johor Bahru Flour Mills

We completed and handed over a Pennant Condensate Recovery System for Johor Bahru Flour Mills Sdn. Bhd. on 6 October 2025.

Project details:

Customer

Johor Bahru Flour Mills Sdn. Bhd.

System

Pennant Condensate Recovery System

Project

Supply, installation, testing and handover

Customer Acknowledgement

Letter dated 9 October 2025

The customer confirmed that the supplied products, installations and system were tested and verified to be in good working condition and performing according to specifications.

Customer Appreciation & Project Completion Letter
Johor Bahru Flour Mills customer acknowledgement for Val Technology & Engineering condensate recovery system project
Johor Bahru Flour Mills — Condensate Recovery System Project Recognition

Learn more about our Condensate Recovery System Malaysia solutions for industrial steam applications.

Desuperheater System — Central Sugars Refinery, Padang Terap

We completed and handed over a new Pennant Desuperheater System for a 4KG steam line at Central Sugars Refinery (Padang Terap) Sdn. Bhd. on 10 October 2025.

Project details:

Customer

Central Sugars Refinery (Padang Terap) Sdn. Bhd.

System

Pennant Desuperheater System

Application

4KG steam line

Project

Supply, installation, testing and handover

The customer's acknowledgement confirms that the supplied equipment, installation and system were tested and verified to be in good working condition and performing according to project specifications.

Customer Appreciation & Project Completion Letter
Central Sugars Refinery customer acknowledgement for Val Technology & Engineering Pennant Desuperheater System project
Central Sugars Refinery — Desuperheater System Project Recognition

These letters confirm the respective customers' project acceptance and should be understood as customer-issued completion records, rather than independent third-party certifications.

Our Occupational Health, Safety & Environment Commitment

At Val Technology & Engineering, we recognise the importance of safe working practices and environmental responsibility in industrial engineering activities.

Our Occupational Health, Safety & Environment (OHSE) Policy Statement outlines our commitment to:

Regulatory Compliance

Following applicable occupational health, safety and environmental requirements.

Risk Management

Identifying hazards, assessing risks and implementing appropriate control measures.

Employee Awareness

Supporting safety training, supervision and communication.

Safe Working Procedures

Promoting appropriate protective equipment, tools and working practices.

Continuous Improvement

Reviewing and improving our safety and environmental practices.

Our OHSE policy includes objectives relating to Zero Harm, Zero Environmental Incidents and Continuous Improvement. These are our internal management commitments, rather than claims of independently certified OHSE performance.

Our OHSE Policy Statement
Val Technology & Engineering Occupational Health Safety and Environment policy statement
Our Occupational Health, Safety & Environment Policy

Our Industry Participation

We participate in relevant industry events to maintain engagement with industrial businesses, engineering professionals and the markets we serve.

MAPEX 2025 — Sandakan, Sabah

We participated as an exhibitor at MAPEX 2025, held on 11–12 June 2025 in Sandakan, Sabah.

Event details:

Event

MAPEX 2025

Location

Sandakan, Sabah

Participation

Exhibitor

Focus

Industry engagement and business visibility

Our participation provided an opportunity to present our industrial equipment and engineering business within the wider industry community.

MAPEX 2025 Participation Certificate
Val Technology & Engineering MAPEX 2025 exhibitor participation certificate Sandakan Sabah
MAPEX 2025 — Our Exhibitor Participation

Enquire About Our Product Certifications & Engineering Solutions

Whether you are sourcing industrial valves, steam equipment, flow control products or engineering solutions, we can assist with product selection, technical specifications and applicable testing or certification enquiries.

If your project requires third-party witnessed FAT, independent laboratory testing, specific product certifications or supporting compliance documents, share your product details and project requirements with us.

Explore our One-Stop Valve Engineering Company Malaysia services or contact us through our website to discuss your requirements.